6 / 2017-11-22 15:51:18
Optimal order method for multi-level foundation pit bracing project decision
foundation pit support scheme; multiple hierarchy decision; fuzzy analysis method; precedence diagram method; optimal decision
Draft Pending
In the study of various schemes of foundation pit support, it is found that the foundation pit support engineering is complex, and its influencing factors are also hierarchical and fuzzy. The existing optimum Method of foundation pit support schemes often involves a lot of complex calculations, in the realization of the process there is a certain degree of difficulty. Aiming at the characteristics of the foundation pit support project and the shortcomings of the existing schemes, a new decision model for multi - level foundation pit support scheme is established. The model is divided into three layers. The qualitative indexes between layers and layers are processed by fuzzy analysis method. The quantitative indexes in the model are linearly weighted by the precedence diagram method. The optimal decision is made in the candidate pit support scheme by the stepwise progressive calculation. The model has the characteristics of simple, fast and accurate calculation, and has certain practical significance.
Important Date
  • Conference Date

    Dec 23

    2017

    to

    Dec 24

    2017

  • Dec 10 2017

    Draft paper submission deadline

  • Dec 10 2017

    Final Paper Deadline

  • Dec 15 2017

    Draft Paper Acceptance Notification

  • Dec 24 2017

    Registration deadline

Sponsored By
湖北省众科地质与环境技术服务中心
Contact Information
  • Miss Zhang
  • 027*********