Application Technology of Construction Waste in Subgrade of Jingxin Highway
fill subgrade; construction waste; lime - fly ash improvement; indoor experiment; field compaction
Draft Accepted
文斌 钱 / 北京交通大学
明利 黄 / 北京交通大学
Based on the analysis of the construction waste near the Jingxin project, according to different requirements on different parts of the fill subgrade, different disposal methods for the construction waste are put forward in the paper. In the subgrade non-work area, on-site crushing for the construction waste was carried out, and filled to the bottom of the subgrade directly; the quality control requirements were achieved through the impact of rolling, vibration rolling and compaction on subgrade. In the subgrade work area, the construction waste was sorted, crushed, sieved and blended with lime-ash soil, and the compressibility, permeability and CBR value of the improved soil were experimentally studied, its feasibility was verified.
Important Date
  • Conference Date

    Nov 24

    2017

    to

    Nov 25

    2017

  • Nov 10 2017

    Draft paper submission deadline

  • Nov 10 2017

    Final Paper Deadline

  • Nov 25 2017

    Registration deadline

Sponsored By
陕西土木建筑学会
陕西绿色建筑产业技术创新战略联盟
湖北省众科地质与环境技术服务中心
武汉工程大学资源与环境学院
Contact Information
Previous Conferences