Application of the technology for co-disposal of waste rock and tailings in a tailing pool
tailing pond,weste rock dump,co-disposal,seepage,stability
Abstract Accepted
永波 郄 / 北京矿冶科技集团有限公司
Aim at saving land resources and reducing project investment cost,the technology for co-disposal of waste rock and tailings was applied to a tailing pool in its design process, and the tailings dam was formed accompany with waste rock stockpiling with maximum elevation of 182m and width of 496m . This engineering layout is very rare at home and abroad,and the seepage and stability of tailings dam are the key factors of the project.This paper mainly introduced the technology for co-disposal of waste rock and tailings,researched the three-dimensional seepage and dam stability in the running of the tailing pool.The study results show that the tailings dam has characteristics of low infiltration line and well stability. The results can provide reference for similar engineering research and design.
Important Date
  • Conference Date

    Oct 22

    2018

    to

    Oct 24

    2018

  • May 31 2018

    Abstract Submission Deadline

  • Jul 05 2018

    Draft paper submission deadline

  • Aug 10 2018

    Draft Paper Acceptance Notification

  • Oct 24 2018

    Registration deadline

Sponsored By
University of Science and Technology Beijing
McGill University
China University of Mining and Technology (Beijing)
Henan Polytechnic University
Notheastern University
Chongqing University
China University of Mining and Technology
Laurentian University
University of Wollongong
Liaoning Technical University
Xi’an University of Science and Technology
North China University of Technology
Jiangxi University of Science and Technology
Heilongjiang University of Science and Technology
Supported By
中国职业安全健康协会
中国安全生产科学研究院
煤炭信息研究院
中安安全工程研究院
International Journal of Mining Science and Technology
Safety Science
Contact Information