Abstract List
My Submissions
246
244
Study On Leakage Simulation And Reliability Of Chemical Factory Production PipelineAbstract Accepted

Shengnan Wu*, Jianchun Fan, Laibin Zhang

#Plenary Track

243
Study On Process Reliability Of Buried Lng PipelineDraft Rejected

Wei Liang*, Laibin Zhang, Lei Zhang

#Plenary Track

241
Study On Trenchless Monitoring System Based On Virtual Reality TechnologyAbstract Accepted

Shuguang Peng*

#Plenary Track

238
Study On The Effect Of Blasting On Natural Gas Pipeline SafetyDraft Pending

Maosheng Zheng*, Haipeng Teng, Jun Hu

#Plenary Track

237
The Study Of Viv Impact On Pipeline Span Caused By FloodAbstract Accepted

Qing-quan Duan*, Hong Zhang, Jingwei Qiu

#Plenary Track

236
High Pressure Rotary Jet Grouting Pile With UndrainedDraft Pending

Bin Zhou*, Jinghua Zhang

#Plenary Track

235
Design And Construction Of Peng Jia Wan HorizontalAbstract Accepted

Wei Yang*, Feng Qian, Wenqi Yuan

#Plenary Track

234
The Key Technology Of Slurry Pipe Jacking Construction For A River-crossing Electric Power Tunnel PrAbstract Accepted

Taihua Yang*, Qinghua Zheng, Yang Wang, Junbao Yang

#Plenary Track

Important Date
  • Conference Date

    Oct 16

    2013

    to

    Oct 18

    2013

  • May 01 2015

    Draft paper submission deadline

  • May 01 2015

    Early Bird Registration

  • May 15 2015

    Contribution Submission Deadline

  • Jun 09 2015

    Registration deadline

Sponsored By
American Society of Civil Engineers