750 / 2019-04-26 23:50:15
Modeling and Analysis of Generator Excitation System Parameters of Pushihe Pumped Storage Power Station
Index Terms-Excitation system; PID parameters; identification technology; Modeling and simulation
Draft Accepted
Abstract-Excitation system modeling experiment Pushihe hydropower of Liaoning, first pumped storage in northeast region is introduced, through modeling and simulation verification of dynamic test and later the generator no-load condition, it improves performance of power system stability of the excitation system, and gets reliable practical parameter by using identification technology.In order to ensure that AVR can be put into operation safely and stably, we have tested motor no-load characteristics and generator step response of the 4 generating units in Pushihe Pumped Storage Power Station of Liaoning, and then adjust parameters. This article will take the NO.1 unit for example, and introduce the modeling process of PID parameters in the excitation system.
Important Date
  • Conference Date

    Oct 21

    2019

    to

    Oct 24

    2019

  • Oct 13 2019

    Abstract Notification of Acceptance

  • Oct 13 2019

    Draft paper submission deadline

  • Oct 14 2019

    Draft Paper Acceptance Notification

  • Oct 24 2019

    Registration deadline

  • Oct 29 2019

    Final Paper Deadline

Organized By
Xi'an Jiaotong University
Contact Information