Seismic Coupling Effect between ±800kV UHV Converter Transformer and Grid-side Equipment
ID:183 View Protection:ATTENDEE Updated Time:2020-11-11 12:09:58 Hits:354 Poster Presentation

Start Time:Pending(12)

Duration:Pending

Session:No Session »

No files

Abstract
To study the influence of grid-side equipment on the seismic performance of the converter transformer and bushing system, finite element models of the interconnected and stand-alone ±800kV UHV converter transformer and the grid-side equipment were established The sliding of the fittings at the top of grid-side bushings was simulated. The seismic response of bushings were analyzed, and the results indicated that the frequencies of the first 20 orders of the UHV converter transformer and bushing system is close to the seismic preeminent period, thus quasi-resonance is easy to occur. The grid-side equipment can significantly amplify the stress and displacement of grid-side bushing. The relative displacement in fittings is great in earthquake. Therefore, the coupling effect between the grid-side equipment and the converter transformer should be considered.
Keywords
UHV converter transformer and bushing system; seismic responses; finite element analysis; interconnected electrical equipment; grid-side equipment
Speaker
CHANG HE
Tongji University

Submission Author
XING CHEN Tongji University
QIANG XIE Tongji University
CHANG HE Tongji University
XIAOXUAN LI Tonji University
XINHAO SUN Tongji University
Submit Comment
Verify Code Change Another
All Comments
Important Date
  • Conference Date

    Oct 21

    2019

    to

    Oct 24

    2019

  • Oct 13 2019

    Abstract Notification of Acceptance

  • Oct 13 2019

    Draft paper submission deadline

  • Oct 14 2019

    Draft Paper Acceptance Notification

  • Oct 24 2019

    Registration deadline

  • Oct 29 2019

    Final Paper Deadline

Organized By
Xi'an Jiaotong University
Contact Information