In the conventional protection system of the distribution system in Korea, modified International Electrictechnical Commission (IEC) curves and curves developed by Korea Electric Power Research Institute (KEPRI) have been used. The use of such mixed curves causes the protective coordination system to malfunction. It is argued that this malfunction must be corrected for the protection coordination system of the domestic distribution system, and the only one unified international standard IEC curve should be used for this. And in case of fuse, it is installed only in single phase in Korean distribution system. Therefore, the rated current is so small that it does not suitable for protective coordination. Therefore, in this paper, we describe the results of the coordination of Epoxy Fault Insulator (EFI), which replaces the fuse with the unified very inverse curve of IEC. A protective coordination simulation which simplified the protection system of the Korean power system is conducted through Electrical Transient Analyzer Program (ETAP). The simulation results show that each protective device follows the protective coordination rules within the prescribed rules.
Keywords
Distribution system,Epoxy Fault Insulator,ETAP,IEC curve,Protective Coordination
Speaker
Chul-Hwan Kim
Professor Sungkyunkwan University

Submission Author
Ji-Soo Kim Sungkyunkwan University
Jinsol Song Sungkyunkwan University
Chul-Hwan Kim Sungkyunkwan University
Nam-Hun Cho Korea Electric Power Corporation Research Institute
Submit Comment
Verify Code Change Another
All Comments
Important Date
  • Conference Date

    Oct 21

    2019

    to

    Oct 24

    2019

  • Oct 13 2019

    Abstract Notification of Acceptance

  • Oct 13 2019

    Draft paper submission deadline

  • Oct 14 2019

    Draft Paper Acceptance Notification

  • Oct 24 2019

    Registration deadline

  • Oct 29 2019

    Final Paper Deadline

Organized By
Xi'an Jiaotong University
Contact Information