The Development of Jiangsu Power Grid in 2016-2020
ID:269 View Protection:PUBLIC Updated Time:2020-10-18 11:14:14 Hits:841 Poster Presentation

Start Time:2020-11-04 15:45(Asia/Shanghai)

Duration:5min

Session:G Poster session » G6Poster Session 8

Abstract
In the past five years, Jiangsu power grid has formed a "six verticals and six horizontals" transmission grid. At the same time, social power consumption and the installed capacity of 220kV and above transformers continues to reach new heights. In this paper, we analyze the achievements of Jiangsu power grid in the past five years, combine with the power grid statistics such as social power consumption and dispatching power in Jiangsu. Based on these statistics, we try to analyze the development trend of Jiangsu power grid. Finally, we point out a few hidden trouble of Jiangsu power grid, and provide appropriate proposals for the development plan of the next few years.
Keywords
Jiangsu power grid,power grid statistics,proposal,social power consumption
Speaker
Zhongxi Liu
Jiangsu Keneng Power Engineering Consulting Co., Ltd.

Submission Author
Zhongxi Liu Jiangsu Keneng Power Engineering Consulting Co., Ltd.
Hao Tian Jiangsu Keneng Power Engineering Consulting Co., Ltd.
Submit Comment
Verify Code Change Another
All Comments
Important Date
  • Conference Date

    Nov 02

    2020

    to

    Nov 04

    2020

  • Oct 27 2020

    Draft paper submission deadline

  • Nov 03 2020

    Contribution Submission Deadline

  • Nov 04 2020

    Registration deadline

  • Nov 17 2020

    Final Paper Deadline

Sponsored By
IEEE IAS Student Chapter of Huazhong University of Science and Technology (HUST)
Organized By
Huazhong University of Science and Technology
Contact Information