Electric-thermal energy storage configuration of regional integrated energy system based on wind power prediction
ID:63 View Protection:ATTENDEE Updated Time:2020-10-28 15:20:18 Hits:849 Oral Presentation

Start Time:2020-11-02 14:30(Asia/Shanghai)

Duration:20min

Session:G Power System 2 » GPower System

Video No Permission Presentation File

Tips: Only the registered participant can access the file. Please sign in first.

Abstract
In order to solve the problem of integrated energy/thermal energy storage configuration, a regional integrated energy system power/thermal energy storage configuration method based on wind power prediction is proposed. First of all, a dynamic neural network prediction model of wind power prediction is constructed to effectively predict the power of wind farms in regional integrated energy systems. Then, the behavior of charging and releasing energy from regional integrated energy system is analyzed, the connection between power storage, heat storage and regional wind farm power is established, and the electric coupling relationship is considered to form a joint optimization configuration model of electric/thermal energy storage. Finally, select the actual data of a certain place, set up three scenarios, the prediction results are substituted into the optimization model to calculate the power storage and heat storage configuration, and the comparison verifies that the wind power prediction under this method has a good effect, which is conducive to the optimal allocation of energy storage resources and reduce costs.
 
Keywords
regional integrated energy system,Wind Power Forecasting,dynamic neural network,electric/thermal energy storage,joint optimization configuration,mixed integer planning
Speaker
Yizong Guo
College of electrical engineering; Zhejiang University

Chutong Wang
College of electrical engineering, Zhejiang University

Submission Author
Yizong Guo College of electrical engineering; Zhejiang University
Bo Yang Inegrated Energy Tchnician Planning and Research Center of Guangzhou
Jun Pan Inegrated Energy Tchnician Planning and Research Center of Guangzhou
Yishun Zhu Inegrated Energy Tchnician Planning and Research Center of Guangzhou
Xurui Huang Inegrated Energy Tchnician Planning and Research Center of Guangzhou
Xing Zhang Inegrated Energy Tchnician Planning and Research Center of Guangzhou
Chuangxin Guo College of electrical engineering, Zhejiang University
Chutong Wang College of electrical engineering, Zhejiang University
Submit Comment
Verify Code Change Another
All Comments
Important Date
  • Conference Date

    Nov 02

    2020

    to

    Nov 04

    2020

  • Oct 27 2020

    Draft paper submission deadline

  • Nov 03 2020

    Contribution Submission Deadline

  • Nov 04 2020

    Registration deadline

  • Nov 17 2020

    Final Paper Deadline

Sponsored By
IEEE IAS Student Chapter of Huazhong University of Science and Technology (HUST)
Organized By
Huazhong University of Science and Technology
Contact Information