Review of the Development of Hubei Power Grid during the 13th Five-Year Plan Period and Prospect of the 14th Five-Year Plan
ID:60 View Protection:ATTENDEE Updated Time:2022-05-16 09:23:25 Hits:367 Poster Presentation

Start Time:Pending(Asia/Shanghai)

Duration:Pending

Session:No Session »

Video No Permission Presentation File Attachment File

Tips: Only the registered participant can access the file. Please sign in first.

Abstract
During the 14th Five-Year Plan period, Hubei Power Grid will inevitably face the changes and challenges that are brought by power system transformation. This paper introduces basic situation of Hubei Power Grid during the 13th Five-Year Plan period, such as social economy, power grid structure, installed power capacity, total electricity consumption and load, electricity demand, power grid equipment and line loss rate, analyzes critical influencing factors during the 14th Five-Year Plan period, and puts forward the trend of line loss rate of Hubei Power Grid during the 14th Five-Year Plan.
 
Keywords
basic situation; Hubei Power Grid; the 13th Five-Year Plan; influencing factors; the 14th Five-Year Plan
Speaker
WangWenna
国网湖北省电力有限公司电力科学研究院

Submit Comment
Verify Code Change Another
All Comments
Important Date
  • Conference Date

    May 27

    2022

    to

    May 29

    2022

  • Feb 28 2022

    Draft paper submission deadline

  • May 29 2022

    Registration deadline

  • Jun 22 2022

    Contribution Submission Deadline

Sponsored By
IEEE Beijing Section
China Electrotechnical Society
Southeast University
Supported By
IEEE Industry Applications Society
IEEE Nanjing Section
Contact Information