The safety risks in the operation process of the long river-crossing tunnels were identified systematically and comprehensively, and the risk assessment index system was established by categorizing, merging and integrating the factors of people, vehicles, tunnels, environment and management. Combined with the safety science and system theory, the complex safety risk factors were refined. Then the analytic hierarchy process was used to determine the weight of the index, and the gray correlation theory was used to analyze and calculate the value of the index. Some reference and ideas can be provided for the operation safety risk management of the long river-crossing tunnels.
Keywords
CICTP
Speaker
Qinkai Luo
China Design Group Co., Ltd.

Submission Author
Qinkai Luo China Design Group Co., Ltd.
Submit Comment
Verify Code Change Another
All Comments
Important Date
  • Conference Date

    Dec 17

    2021

    to

    Dec 20

    2021

  • Dec 16 2021

    Contribution Submission Deadline

  • Dec 24 2021

    Registration deadline

Sponsored By
Chinese Overseas Transportation Association
Chang'an University
Contact Information