INFLUENCE OF GROUND LOSS ON SETTLEMENT OF GROUND AND MAGLEV PILE FOUNDATION IN SHIELD TUNNELING
ID:1986 View Protection:ATTENDEE Updated Time:2021-12-03 14:44:08 Hits:262 Poster Presentation

Start Time:2021-12-17 08:49(Asia/Shanghai)

Duration:1min

Session:P2 Poster2021 » P2T1Track 1 Advanced Transportation Information and Control Engineering

No files

Abstract
Shield construction will cause ground disturbance, and then cause the settlement of surrounding ground and adjacent buildings, which brings great challenges to the stability of excavation face and the safety of surrounding buildings and facilities. The maximum ground settlement is related to the corresponding ground loss rate, and the ground settlement can be controlled by controlling the ground loss rate. However, in the actual engineering, we should not only pay attention to the ground settlement, but also pay attention to the deformation of the surrounding structures. Based on the background of Maglev crossing Shanghai Metro Line 13, PLAXIS 2D model is established to calculate the ground settlement and structure settlement under different ground loss rates. Combined with peck formula, the relationship between ground loss rate, ground settlement and pile foundation settlement is analyzed by comparing the modeling calculation results with the analytical results of the formula.
Keywords
CICTP
Speaker
Guoqiang Wang
Tongji University

Submission Author
Guoqiang Wang Tongji University
Submit Comment
Verify Code Change Another
All Comments
Important Date
  • Conference Date

    Dec 17

    2021

    to

    Dec 20

    2021

  • Dec 16 2021

    Contribution Submission Deadline

  • Dec 24 2021

    Registration deadline

Sponsored By
Chinese Overseas Transportation Association
Chang'an University
Contact Information