Simulation research on lightning risk and protection of 500kV/±800kV large crossing transmission lines erected on the same tower
ID:552 View Protection:ATTENDEE Updated Time:2022-08-29 16:17:49 Hits:311 Poster Presentation

Start Time:Pending(Asia/Shanghai)

Duration:Pending

Session:No Session »

Presentation File

Tips: Only the registered participant can access the file. Please sign in first.

Abstract
This work of this paper is about a large crossing project with hybrid voltage , so there is no experience about it. Therefore,it is necessary to carry out special lightning protection research on the large crossing project to provide technical support for engineering design and construction.  It is obvious that the large crossing project has the characteristics of high tower, long span length, and hybrid voltage erection. Based on these factors, this paper uses ATP software to model the project and obtain the corresponding lightning withstand level and lightning shielding failure proof level. Subsequently, the shielding failure trip-out rates of the DC part and AC part of the AC / DC common-frame tower are obtained by the improved electro-geometrical model. According to the safety regulations of large crossing projects, this paper converts the counterattack trip-out rate and shielding failure trip-out rate to the safety years in order to pass assessment. At the same time, in the process of lightning protection calculation, considering the specialty of large crossing engineering, in order to ensure the safe of the project, this paper adopts lightning protection measures including but not limited to modifying the protection angle of lightning line or adding hanging arrester, and then calculates and analyzes its lightning protection effect for large crossing project.
Keywords
safety years,transmission lines,electrical geometry model,shielding failure trip-out rate,large crossing
Speaker
Haochen Zhang
WuHan University

Submission Author
Huan Jin China Electric Power Research Institute
Hongbing Shen China Electric Power Research Institute
Jiao Zhu State Grid Jiangsu Electric Power Company Construction Branch
Haochen Zhang WuHan University
Yeqiang Deng Wuhan University
Yu Wang Wuhan University
Dongyang Lin State Grid Jiangsu Electric Power Company Construction Branch
Zhangxuan Wang State Grid Jiangsu Electric Power Company Construction Branch
Submit Comment
Verify Code Change Another
All Comments
Important Date
  • Conference Date

    Sep 25

    2022

    to

    Sep 29

    2022

  • Aug 15 2022

    Early Bird Registration

  • Sep 10 2022

    Contribution Submission Deadline

  • Nov 10 2022

    Registration deadline

  • Nov 30 2022

    Draft paper submission deadline

  • Nov 30 2022

    Final Paper Deadline

Sponsored By
IEEE DEIS
Organized By
Chongqing University
Contact Information