100 / 2023-12-30 15:00:33
煤矿井下综采工作面设备安装回撤数字化场景建设
综采设备,数字化,场景
Draft Accepted
燕妮 程 / 晋能控股装备制造集团晟泰能源投资有限公司机电安装分公司
煤矿井下综采工作面设备安装回撤数字化场景建设

(综采设备数字化场景)



摘要:随着数字化在智慧矿山的不断建设,煤矿井下主要机械设备在运行、维护、检修等方面都得到了长足的进步。如何结合智慧矿山管控平台的各类大数据,广泛深入地利用好现有的信息化、数字化、可视化系统,通过“数字化场景再造”,全面挖掘煤矿井下综采工作面设备安装、运行、回撤及与其相关的巷道底顶板、水文、地质条件等数据价值,借助建模、虚拟、BIM、透明地质等相关技术,建设基于“智慧矿山”的煤矿井下综采工作面设备安装回撤数字化平台,在保证安全、高效、快速的前提下,简化施工流程、优化作业工艺、提升作业效率、降低劳动强度、完善设备全寿命周期管理,全面解决煤矿井下综采工作面设备安装、回撤、调试、运行等搬家难题是本文重点讨论的内容。



作者简介:程燕妮、女、汉族、中共党员、研究生学历、目前在晋能控股装备制造集团晟泰能源投资有限公司机电安装分公司(JinNeng Holding Equipment Manufacturing Group, ShengTai Energy Investment Limited Company, Electromechanical Installation Branch)工作。

联系方式:18435608111











Digital scene construction of equipment installation and withdrawal in fully mechanized mining face of coal mine

(Combined mining equipment- Digitization-Scene)



Abstract: With the continuous development of digitalization in smart mines, significant progress has been made in the operation, maintenance, and overhaul of major mechanical equipment in underground coal mines. The focus of this paper is on how to leverage the various types of big data from the smart mine management and control platform, extensively and deeply utilize existing information, digitalization, and visualization systems, and through "digital scene reconstruction", comprehensively mine the data value of equipment installation, operation, and withdrawal in fully mechanized mining faces in underground coal mines, as well as related roadway floor and roof, hydrology, and geological conditions. By using modeling, virtualization, BIM, transparent geology and other related technologies, we aim to build a digital platform for equipment installation and withdrawal in fully mechanized mining faces in underground coal mines based on the "smart mine" concept. The goal is to simplify construction processes, optimize operating procedures, improve operational efficiency, reduce labor intensity, and improve equipment life cycle management while ensuring safety, efficiency, and speed. This platform aims to comprehensively address the challenges of equipment installation, withdrawal, debugging, and operation in fully mechanized mining faces in underground coal mines.

 
Important Date
  • Conference Date

    May 29

    2024

    to

    Jun 01

    2024

  • May 08 2024

    Draft paper submission deadline

Sponsored By
China University of Mining and Technology