105 / 2017-05-25 10:26:53
Analysis of Shale Gas Drilling Engineering Management Based on 5M1E
shale gas, drilling engineering, engineering management, 5M1E
Need Revise
志涛 赵 / 北京探矿工程研究所
Shale gas is a new energy and different from the conventional oil and gas. Drilling is one of the most important means in shale gas exploration and development. Shale gas drilling and conventional drilling engineering has many differences and it is facing many challenges and problems. New technology and new management are needed for shale gas drilling. So total quality management(TQM) is introduced into shale gas drilling engineering in this paper. There are six factors that can affect quality control according to TQM, which are man, machine, material, method, measurement, environment (namely 5M1E). 5M1E are defined in shale gas drilling engineering and China current situation of shale gas drilling are analyzed based on 5M1E. The authors raise several suggestions to enhance the level of shale gas drilling engineering management.
Important Date
  • Conference Date

    Jul 22

    2017

    to

    Jul 23

    2017

  • Jul 10 2017

    Draft paper submission deadline

  • Jul 18 2017

    Draft Paper Acceptance Notification

  • Jul 18 2017

    Final Paper Deadline

  • Jul 23 2017

    Registration deadline

Contact Information
  • 张先俊(论文出版及检索)
  • 027-87332517
  • 186********
  • 027*********