113 / 2017-06-07 16:40:42
Organization based bidding Alternative determination for international construction projects
Final Paper
Chuan Chen / Sichuan University
光华 李 / Chengdu University of Technology
Accompanying the promotion of the Belt and Road Initiative, the international construction market to Chinese oversea contractors become even broader, accordingly the competition is increasingly fiercer. Bid-no-bid decision is one of the most important decisions made to any Chinese contractor who participate in the competitive international construction market. The traditional research about bid-no-bid decision mainly focus on the contactor’s own conditions to appraise whether to bid or not, which is not fit to contractor’s practice. The decision of bid/no bid decision is not static, but dynamic. Hence, the author proposes that no matter whether any contactors satisfy the requirement of biding, a comparison of organization based bid alternatives shall be made firstly. Based on literature study, the possible bid alternatives in the form of organization were developed. And then a simple and practicable alternatives comparison model was developed based on the method of FAHP (Fuzzy AHP) to determine the best alternative and whether it is fit to bid. Finally, a case study was introduced to elaborate the detailed alternatives comparison procedure and the method of FAHP utilized.
Important Date
  • Conference Date

    Jul 22

    2017

    to

    Jul 23

    2017

  • Jul 10 2017

    Draft paper submission deadline

  • Jul 18 2017

    Draft Paper Acceptance Notification

  • Jul 18 2017

    Final Paper Deadline

  • Jul 23 2017

    Registration deadline

Contact Information
  • 张先俊(论文出版及检索)
  • 027-87332517
  • 186********
  • 027*********