112 / 2016-12-05 22:27:32
The Research on the Renovation Method of Sheet-pile Wharf by FEA
sheet-pile wharf; dredging reconstruction; semi-covered pile; strength reduction
Abstract Accepted
董明 / 河海大学 港口海岸与近海工程学院
In this paper, the renovation method about cast-in-place underground continuous wall and semi-covered piles on sheet-pile wharf is analyzed by using ABAQUS to establish finite element model. We can draw the following conclusions: First, the method of cast-in-place underground continuous wall can reduce the rod tension and the maximum bending moment of sheet-pile wall due to the increased penetration depth. Second, the method of semi-covered piles can reduce the soil pressure behind the sheet-pile wall because of the shelter pile’s blocking effect and the soil arching effect and it can also reduce the maximum bending moment of sheet-pile wall. The analysis of the overall stability of the semi-covered sheet-pile using the strength reduction method is carried out and the analysis shows that the sliding position will be changed and the overall stability of the pier will be greatly improved, which can be considered in design.
Important Date
  • Conference Date

    Dec 20

    2016

    to

    Dec 21

    2016

  • Dec 13 2016

    Draft paper submission deadline

  • Dec 21 2016

    Registration deadline

Contact Information
  • Miss 张老师
  • 027*********