Abstract List
My Submissions
115
Risk Management of PPP project in the preparation stage based on Fault Tree AnalysisAbstract Accepted

关关秋玲*, 邢邢元志

#Plenary Track

114
Risk Management of PPP project in the preparation stage based on Fault Tree AnalysisAbstract Accepted

关秋玲*, 邢邢元志

#Plenary Track

113
112
107
Review of Bridge Moving Force IdentificationAbstract Accepted

weiwenjie, chenzhen*

#Plenary Track

106
The Review of Bridge Prestressed Force IdentificationAbstract Accepted

chenzhen*, shaowenda

#Plenary Track

104
Seismic Performance of Semic-Rigid Steel Frame with Y-Shaped Eccentric BraceAbstract Accepted

洪洪敏, 李李少华*

#Plenary Track

103
Design and Research of a Large Span Dry Coal ShedAbstract Accepted

ZHUSi*

#Plenary Track

102
A In Situ Assessment Method for RC Bridges After Fatigue DamageAbstract Accepted

Zhong钟铭*

#Plenary Track

Important Date
  • Conference Date

    Dec 20

    2016

    to

    Dec 21

    2016

  • Dec 13 2016

    Draft paper submission deadline

  • Dec 21 2016

    Registration deadline

Contact Information
  • Miss 张老师
  • 027*********